Tuesday, 30 December 2014

Congestion Management in Day Ahead Indian Energy Market

The enactment of Electricity Act 2003 was a major reform intended to bring in competition and introduction of private players in the Indian power sector. These reforms covered nearly every aspect of electricity generation, transmission, sub-transmission and distribution. 

The Central Electricity Regulatory Commission (CERC) sets the terms for open access to grid and regulate power trading in India. 

Power Exchanges in India:



The Electricity Act sanctioned wholesale and a day-ahead electricity market and opened up two Power Exchanges (PX) in India in the year 2008.      

Power Exchange India Ltd. is India’s first institutionally promoted power exchange. Indian Energy Exchange Ltd. (IEX) is another automated power trading platforms for delivery of electricity. Today more than 1000 private generators, both commercial and renewable producers, and more than 3000 open access consumers across 29 states and 5 union Territories are using the IEX platform to manage their energy trading portfolio. 

In order to promote short-term electricity trading, the third exchange i.e. the National Power Exchange (NPEX) was also approved by CERC in the year 2008-09. Although the promoters of this third exchange, a joint venture of Power Finance Corporation (PFC), National Thermal Power Corporation (NTPC), National Hydro Power Corporation (NHPC), and Tata Consultancy Services (TCS), have decided to wind up the company. Following the company’s decision, CERC has withdrawn the permission granted to the exchange.


Ways to trade wholesale electricity in India:


There are three ways to trade wholesale electricity in India:
1.      bilateral contracts between buyers and sellers,
2.      the day-ahead market and
3.      Real-time balancing or Unscheduled Interchange (UI).

These segments differ in terms of the time when electricity is traded relative to the date of delivery, how prices are set and the regulatory limits. Most trade happens through long-term bilateral contracts set more than one year in advance of delivery. Nearly 89% of the total electricity generation is traded on long-term contracts, typically between state-owned generators and distribution companies. 

Short-term Bilateral contracts, set less than one year in advance of delivery, comprise a further 5% of generation. These contracts are mediated by power traders and most often apply to daily or monthly blocks. 

The last of the scheduled power trade is the day-ahead market, which handles 2% of generation. Rest of the generation, about 3% of generation, is not scheduled, which is demanded and supplied in real time through a mechanism called Unscheduled Interchange (UI).

Day Ahead Market:

Day Ahead Market (DAM), which gets its name for hosting electricity trading one day-ahead of when the power is to be delivered, was launched in June 2008. In this market, participants transact electricity on a 15 minute time block basis, thus total 96 blocks for a day. DAM is a physical electricity trading market for delivery of electricity for some or all the 15 minute blocks in 24 hours of the next day. The next day starts from midnight. The prices and quantum of electricity to be traded are determined through a double sided bidding process.

In the double auction pools or double sided bidding process, the distribution companies also bid for purchasing power. Once the buyer and seller bid the amount of power and the price, the power exchange forms an aggregate supply bid curve for suppliers and aggregate demand bid for the buyers or consumers. The supply bids are stacked from lowest to highest whereas the demand bids are arranged from highest to lowest. 

The Market Clearing Price (MCP) is determined on the basis of intersection point of the demand and supply curve. Clearance is obtained from the respective State Load Despatch Centre (SLDC) by buyers and sellers on the basis of availability of network.    

A day prior to the actual delivery of electricity, both buyers and sellers submit their bids. These bids are totally anonymous and submitted electronically during the bid call session which is from 10.00 am to 12.00 noon. The minimum allowable quantity for buy/sell in the standing clearance should not be less than 0.1 MW. The minimum volume step is also 0.1 MW and the minimum quotation step is Rs. 1 per MWh.

Congestion:

In the competitive electricity market, there is significant and frequent change of power flows due to market arrangements. Because of these flow variations overloading of transmission lines and transformers beyond transfer limit may take place. This is called congestion of transmission system.


Generally when there is no congestion in the transmission system, MCP is the same for the entire Power System. But when congestion happens, the concept of Locational Marginal Price is used.

Method of managing the transmission congestion:

Congestion of transmission system should be alleviated for the secure operation of the system. It can be mitigated by rescheduling the generators, and simultaneously curtailing the electrical load. In different types of electricity market, the method of managing the transmission congestion differs. 

The following three methods:
1.      Price Area Congestion Management,
2.      ATC based Congestion Management, and
3.      OPF based Congestion Management.

Apart from the above methods, application of FACTS devices also relieves congestion. Suitable placement of various shunt and series FACTS devices are helpful in increasing the load-ability of the transmission network resulting in reduction in congestion.

In the Indian Day Ahead Market, Price Area or Market Splitting technique is adopted for congestion management. In this method, the calculated contractual power flow is compared with the available transmission capacity for spot trading. If the power flow exceeds the transmission capacity, the prices on both sides of the transmission bottleneck are adjusted so that the calculated power flow equals the transmission capacity. When the flow exceeds the capacity, the whole market area is split into surplus area and deficit area. The price of energy is lowered in the electricity surplus area and increased in the deficit area. This in turn, reduces the sale and increases the purchase in the electricity surplus area. Similarly, in the deficit area the sale is increased and the purchase is reduced.


This reduces the power flow on the congested line and the contracted flow becomes equal to the transmission capacity. The country has 5 electrical regions, the Northern region, North-Eastern region, Eastern region, Western region, and the Southern region. Each region has been divided into 2 bid-areas so as to accommodate any emergency of congestion in the intra-regional transmission system.

Sunday, 28 December 2014

Some Definitions as per the Central Electricity Regulatory Commission Regulations, 2010.

The Indian Electricity Grid Code (IEGC) 2006 is a regulation made by the Central Electricity Regulatory Commission (CERC) in exercise of powers conferred under The Electricity Act 2003. IEGC lays down the rules, guidelines and standards to be followed by the persons and participants in the system engaged in planning, developing and operating the Power system.

Further regulations were made by the CERC, called Central Electricity Regulatory Commission (IEGC) Regulations 2010, have superseded the IEGC and have come into force from May 2010.

Some of the definitions as mentioned in these regulations are:

1.      Ancillary services: Ancillary services are those services necessary to support the power system operation in maintaining power quality, reliability and security of the system or the grid. Examples are active power support for real time load following, reactive power support, black start etc.

2.    Black Start:  Black Start means the starting of a power plant or system after a partial or total blackout in the region.

3.   Available Transfer Capability (ATC): Available Transfer Capability is the Total Transfer Capability (TTC) minus Transmission Reliability Margin (TRM). ATC is the transfer capability of the transmission system, of the inter-control area, available for commercial transactions. These transactions may be through long term access, medium term open access, and short term open access in a specific direction considering the security aspects of the network.

4.      Total Transfer Capability (TTC): Total Transfer Capability is the quantity of electric power that can be transmitted reliably over the transmission system of the inter-control area under a given set of operating conditions considering the occurrence of the worst credible contingency.

5.       Transmission Reliability Margin (TRM): Transmission Reliability Margin is the margin in terms of MW kept in the Total Transfer Capability (TTC) required to ensure the security of the interconnected transmission system under a reasonable range of uncertainties.

6.      Bilateral Transactions:  Bilateral Transaction means a transaction for exchange of electrical energy in MWh between a given buyer and a seller from a given point of injection to a mentioned point of drawal for a fixed or changing quantity of power (MW) for any time period during a month. This transaction of electrical energy may be a direct transaction or through a trading licensee or power exchange.

7.      Unscheduled Interchange: For a generating station or a seller, Unscheduled Interchange means the total actual generation minus its total scheduled generation in a given time block, whereas for a buyer or a beneficiary, it is total actual drawal minus its total scheduled drawal in the given time block.

8.      Long Term Access: Long Term Access means the authority to use the Inter State Transmission System (ISTS) for a period more than 12 years, but not exceeding 25 years.

9.      Medium Term Open Access: Medium Term Open Access means the authority to use the Inter State Transmission System (ISTS) for a period more than 3 months, but not exceeding 3 years.

10.  Short Term Open Access: Short Term Open Access means the authority to use the Inter State Transmission System (ISTS) for a period upto 1 month at one time.

11.  Inter State Transmission System (ISTS): Inter State Transmission System means any transmission system for the conveyance of electricity from one state to another, across the territory of an intervening state as well as within the state, built, owned, operated and controlled by Central Transmission Utility (CTU), i.e. Power Grid Corporation of India.

12.  Control Area: Control area is an electrical system bounded by interconnecting Tie lines, metering and telemetry system which controls its generation and or load to maintain its scheduled interchange with other area and helps to regulate the frequency of a synchronously operating power system. 

13.  Congestion: Congestion is a case where the demand for transmission capacity exceeds the Available Transfer Capability.

14.  Demand: Demand means the demand for active power in MW and reactive power in MVAr.

15.  Load: Load is the MW/MWh/MVA/MVAh consumed by a utility or installation.

16.  Ex-power plant: Ex-power plant means the net active power output in MW and energy output in MWh of a generating station after deducting the auxiliary consumption of the power plant and the transformation losses.

17.  Despatch Schedule: Despatch Schedule   is the net MW and MWh output of a generating station or power plant (ex-power plant) scheduled to be injected to the grid from time to time.

18.  Spinning Reserve: Spinning Reserve means partly loaded generating capacity with some reserve margin that is synchronized to the rest of the system and is ready to provide increased generation at short notice pursuant to despatch instructions by the system operator or instantly in case of frequency collapse.

19.  Independent Power Producer (IPP): Independent Power Producer is a generating company not owned or controlled by the Government (Central or State Government).

20.  Forced Outage: Forced Outage means an outage of a generating unit or a transmission facility due to a fault or any other reasons apart from planned shutdown.


21.   Connection Point: Connection Point is a point where a plant and or electrical apparatus connect to a transmission or distribution system.

Friday, 5 December 2014

Moves to Strengthen the Indian Power sector

The Indian power sector offers tremendous potential for investing companies. The power market in the country is the fifth largest in the world. The targeted generation capacity in the 12th Five Year Plan (FYP) is 88,537 MW and for the 13th FYP the envisaged generation capacity addition is 94,000 MW (by 2022). Such a boost in generation capacity needs matching transmission and distribution infrastructure. Growing environmental concerns have shifted the interest towards renewable sources of energy which mainly includes wind power, and solar PV plants. In the recent past there has been considerable growth in power plants based on non-conventional and renewable sources of energy.
The sheer size of the power market in the country along with the attractive returns available is significant to bring in many Indian and international players. The Government of India has also initiated several policies to promote and acquire investments in the power sector. The Electricity Act 2003 has given a liberal framework for generation by de-licensing the generation sector. All controls on Captive Power Plants have also been lifted. The liberal provisions in the Electricity Act 2003 have paved the way for a more reliable and cost effective power in the country. Prominent policies such as the National Electricity Policy, Ultra Mega Power Project Policy, Tariff Policy etc. have contributed a lot to boost the confidence of the participants in the power sector.

Foreign Direct Investment (FDI) up to 100 percent is permitted for generation and transmission of electrical energy produced by thermal and hydel power plants. Route to FDI is also open for renewable energy generation and distribution, distribution of electric energy and power trading. Several schemes are also there to attract new and young entrepreneurs entering the renewable energy sector. Fast and efficient growth of the power sector in the country will also facilitate the creation of enormous job opportunities.