Tuesday, 9 September 2014

Electrical Engineering: One of the fastest growing fields in India

The demand for electrical energy in India has increased many folds during the recent time because of:

  1. growth in population, 
  2. enhanced lifestyle, 
  3. increased automation in industrial sector etc. 


Recent studies by the US Department of Energy indicate that China, India and Brazil will be the most rapidly growing countries in terms of electrical demand. Total 1102.9 TWh of electricity was produced in the country during 2013-14 making it the 3rd largest producer of electrical energy in the world in the year 2013. 

International Energy Agency estimates that India will add another 600 to 1200 GW of installed capacity before the year 2050. This is clearly echoed in the report of Ministry of Power, Government of India, 2012, in which additional generation capacity to be added in the 12th Five Year Plan is stated as 76 GW. It needs to add another 170 GW of installed generation capacity in the next decade to get the desired 9% growth in GDP and this can be achieved through large capacity power projects such as the Ultra Mega Power Projects based on super-critical technology.  
As on July 2014, the installed generation capacity in India is 250.5 GW. Indian electricity sector is certainly amongst the most active players in Renewable Energy (RE) utilization especially the wind energy. The grid interactive wind and solar generation is 21.69 GW and 2.75 GW respectively; with still more projects to materialize in the coming decades. 

The objective of Jawaharlal Nehru National Solar Mission (JNNSM) is to establish India as a global leader in solar energy by creating conducive atmosphere in the country. The mission under the brand name “Solar India” set an ambitious target of adding 20 GW of grid connected and 2 GW of off-grid capacity by year 2022.
Private sector has a great role to play in Indian power sector and there are many prominent names that have registered their strong presence. At present private sector accounts for nearly 40 % in the total installed generation capacity of the country and is set to increase. Moreover, private players are extending technical assistance to government in erecting power plants and other facilities, involved in power trading, evolving clean energy development mechanism, supplying the power etc. as on March 2014, India had 13.9 GW of installed generation capacity based on super-critical technology; of which Adani Power (one of the leading private players in the Indian power sector) has commissioned the maximum of 6.6 GW. Other big private companies in the generation sector are Tata Power, Reliance Power, Essar Power etc. Government of India has issued certain guidelines for private sector participation in transmission sector also.        
In the light of above facts, various job opportunities are available to electrical engineers in Indian power sector. They can work in both public and private sector industries involved in power generation, transmission, distribution industry as well as in their ancillary units. These companies employ them as engineers or managers, and make them responsible for design and development, installation, commissioning, operation and maintenance of power handling equipment and systems. The service sector which provides the required maintenance also forms a sizable segment.  

The various governmental organizations involved in the Indian power sector are National Thermal Power Corporation (NTPC), National Hydro Power Corporations (NHPC), Damodar Valley Corporation (DVC), Power Finance Corporation (PFC), Power Grid Corporation of India Limited (POWERGRID), and various state level power generation companies and power suppliers. These agencies are providing ample job opportunities to graduate electrical engineers. The companies are advertising the vacancies in leading national/ local newspapers and posting the same on their websites. These companies usually ask for 60 percent or above in graduation level. The recruitment process consists of mainly written test, group discussion and personal interview. Sometimes, a technical interview may also be conducted. 

The final selection is based on the overall performance of the candidate. Reservation to various categories is given as per the prevailing government rules. Initially, selected candidates have to work on probation as graduate engineer trainee for one or two years and on the successful completion of probation period they are absorbed as regular engineers.

A huge job potential also exists in rapidly growing private sector for electrical engineers. As far as their selection criterion is concerned, it varies from company to company. However, most of them are hiring on the basis of personal interview of eligible candidates. 

Some of the major private companies in power sector are Tata Power, Reliance Power, Adani Power, Torrent Power, Essar Power, Crompton Greaves, Siemens, Alstom T&D India, Suzlon Energy etc. 

Thursday, 4 September 2014

Better Coal Management: Derailed Generation Sector’s prime requirement

Last updated: Feb 05, 2017 

Significant Generation Capacity Addition:

India has achieved significant generation capacity addition in the last 50 years. The current installed capacity of Indian power system is 305.5 GW (as on Aug 2016) with coal based power plants having a share of nearly 61 percent. Thus, coal based thermal power plants dominate the current Indian generation scenario and in the future also.

India to be among the most rapidly growing countries:

Recent studies by the US department of energy indicate that China, India and Brazil will be the most rapidly growing countries in terms of electrical demand. This is clearly echoed in the report of the “Working Group on Power”, Government of India, Ministry of Power, 2012, in which the additional generation capacity to be added in the 12th Five Year Plan is stated as 76 GW. It needs to add another 170 GW of installed generation capacity in the next decade to get the desired 9% growth in GDP and this can be achieved only through large capacity power projects. 


Concept of Ultra Mega Power Project:


In view of this, the Government of India has come up with the concept of Ultra Mega Power Project (UMPP). These coal powered, super-critical technology based power projects, each with a capacity of 4 GW or more is a series of ambitious power projects planned by the Government of India.


Various Issues in Coal Management Activities:

The various coal management activities such as planning, contracting, procurement, logistics and delivery are managed by different agencies. Thermal power plants, other than pit-head plants, rely on ship, rail or road transportation services to deliver coal from the sources to their plant location. Coal inventory management at the thermal power plant involves accounting of received and consumed coal. 

Many thermal plants have in-adequate automation and management system, often leading to inaccurate coal requirement forecasting. Tracking of coal transportation is also not very advanced. All this lead to inefficiencies and uncertain conditions causing either power plant outage due to lack of coal or un-necessary piling up of coal inventory and blocking of resources. 

Generating companies typically stock up coal for nearly 10 days of operation. The financial loss on account of power plant shut down because of non-availability of coal can be as much as 2 million USD per day for a thermal power plant of 1000 MW.

Therefore, the performance of Indian generation sector is going to be greatly affected by the coal supply management to its coal based thermal power plants. Officials say that the coal production is the same since the last 5 years and the credit goes to improper planning, policies and prevailing corrupt practices. Adding to the wound is the recent declaration of Supreme Court of India which states that the entire allocation of coal blocks from 1993 to 2010 was illegal, arbitrary and non-transparent.

There are situations when majority of coal based power plant in India have left with less than 7 days of coal stock. Many coal based power plants of the Central, State and private sector have been shut down in the past on account of in-adequate coal supply. This also increases the spot price of electricity at the Indian Energy Exchange (IEX). Same situation has aroused in year 2012 also.

Properly Integrated and Automated Coal Management System is required:

The message is loud and clear that the country’s power sector and hence the growth is dependent largely on the coal supply to the thermal power plants. A properly integrated and automated coal management system is required to keep the coal inventory to a minimum, at the same time ensuring un-interrupted power generation.

A better and efficient coal management system has to be derived keeping in view the various Ultra Mega Power Projects coming up in the 12th and 13th FYP. Special attention has to be given for demand side management so that the load can be properly managed during such a crisis.

Ref:

Hindustan Times, 4th sep. 2014